Flood risk management in Italy: Challenges and opportunities for the implementation of the EU Floods Directive (2007/60/EC)

J. Mysiak*, F. Testella, M. Bonaiuto, G. Carrus, S. De Dominicis, U. Ganucci Cancellieri, K. Firus, P. Grifoni

*Corresponding author af dette arbejde
28 Citationer (Scopus)

Abstract

Italy's recent history is punctuated with devastating flood disasters claiming high death toll and causing vast but underestimated economic, social and environmental damage. The responses to major flood and landslide disasters such as the Polesine (1951), Vajont (1963), Firenze (1966), Valtelina (1987), Piedmont (1994), Crotone (1996), Sarno (1998), Soverato (2000), and Piedmont (2000) events have contributed to shaping the country's flood risk governance. Insufficient resources and capacity, slow implementation of the (at that time) novel risk prevention and protection framework, embodied in the law 183/89 of 18 May 1989, increased the reliance on the response and recovery operations of the civil protection. As a result, the importance of the Civil Protection Mechanism and the relative body of norms and regulation developed rapidly in the 1990s. In the aftermath of the Sarno (1998) and Soverato (2000) disasters, the Department for Civil Protection (DCP) installed a network of advanced early warning and alerting centres, the cornerstones of Italy's preparedness for natural hazards and a best practice worth following. However, deep convective clouds, not uncommon in Italy, producing intense rainfall and rapidly developing localised floods still lead to considerable damage and loss of life that can only be reduced by stepping up the risk prevention efforts. The implementation of the EU Floods Directive (2007/60/EC) provides an opportunity to revise the model of flood risk governance and confront the shortcomings encountered during more than 20 yr of organised flood risk management. This brief communication offers joint recommendations towards this end from three projects funded by the 2nd CRUE ERA-NET (http://www.crue-eranet.net/) Funding Initiative: FREEMAN, IMRA and URFlood.

OriginalsprogEngelsk
TidsskriftNatural Hazards and Earth System Sciences
Vol/bind13
Udgave nummer11
Sider (fra-til)2883-2890
Antal sider8
ISSN1561-8633
DOI
StatusUdgivet - 28 nov. 2013

Fingeraftryk

Dyk ned i forskningsemnerne om 'Flood risk management in Italy: Challenges and opportunities for the implementation of the EU Floods Directive (2007/60/EC)'. Sammen danner de et unikt fingeraftryk.

Citationsformater