Abstract

This article investigates progressive development of Aumann-Shapley cost allocation in a multilevel organizational or production structure. In particular, we study a linear parametric programming setup utilizing the Dantzig-Wolfe decomposition procedure. Typically cost allocation takes place after all activities have been performed, for example by finishing all outputs. Here the allocation is made progressively with suggestions for activities. I other words cost allocation is performed in parallel for example with a production planning process. This development does not require detailed information about some technical constraints in order to make the cost allocation.